For practitioners · Updated 20 September 2026 · As at 20 September 2026
What is an outcomes-based planning framework?
An outcomes framework is a chain from vision to things you can count. In spatial planning the usual sequence is vision, principles, objectives, outcomes, measures or indicators, and a monitoring report. The London Plan's Good Growth objectives are the most fully worked English example. Wales embeds well-being goals in statute. The NPPF now asks local plans for no more than ten measurable outcomes. There is not yet a prescribed SDS template.
The chain
Keep the words stable. Different strategies mix them up.
| Term | Meaning |
|---|---|
| Vision | The intended future for the strategy area |
| Principles | How you will work (for example, infrastructure first, or the Welsh "ways of working") |
| Objectives | The things the SDS is trying to achieve |
| Outcomes | The change you would observe if the objective worked |
| Measure | The quantity you will collect |
| Indicator / KPI | The measure expressed so it can be reported, often with a direction or target |
| Monitoring | The report that publishes the indicators and says what happens if they fail |
PM1 already requires an SDS to monitor implementation. PM2 asks local plans for a vision supported by no more than ten measurable outcomes. That local-plan rule is a useful discipline at SDS scale too: few outcomes, each with a measure.
Reference models (not templates to copy blindly)
London Plan Good Growth (2021). Six named objectives, monitored through a statutory Annual Monitoring Report under the GLA Act. The strongest English example of outcomes tied to a legal monitoring duty:
- GG1 Building strong and inclusive communities
- GG2 Making the best use of land
- GG3 Creating a healthy city
- GG4 Delivering the homes Londoners need
- GG5 Growing a good economy
- GG6 Increasing efficiency and resilience
Oxfordshire Strategic Vision (2021). A long-term cross-authority vision to 2050 that does not fix a housing quantum. Useful as a shared frame. Weak as a monitoring system because indicators were acknowledged as needed and not set at adoption.
Well-being of Future Generations (Wales) Act 2015. Seven well-being goals, national indicators and milestones, plus five ways of working. The most legally embedded outcomes model in the UK. Future Wales is aligned to it. England has no equivalent statute for SDS. The seven goals are: a prosperous Wales; a resilient Wales; a healthier Wales; a more equal Wales; a Wales of cohesive communities; a Wales of vibrant culture and thriving Welsh language; a globally responsible Wales.
Use these as comparisons in an SDS evidence note. Do not paste London's six objectives onto a different geography and call it done.
A working SDS set
The outcomes framework template uses ten themes. That is a ceiling, matching the local-plan "no more than ten" idea, not a legal requirement:
- Growth and economy
- Housing
- Health and wellbeing
- Transport and connectivity
- Education and labour market
- Natural capital and green infrastructure
- Water security
- Climate resilience and net zero
- Communities and governance
- Design and place
Each row should have one objective, one outcome, one measure and one indicator. If you cannot name the dataset, it is not yet an indicator.
A filled version of those ten rows, written as full outcome sentences for a growth-corridor SDS, is on the worked example. Three before-and-after rewrites are on how to write one outcome.
One chain, written out
Take housing. A vision sentence such as "everyone can access a high-quality home in a thriving community" is not an outcome. An outcome adds the change you would observe, and a trigger you can fail:
Everyone can access a high-quality home that remains affordable across generations. A school, a surgery, a shop and open space are within an easy walk of new homes and are open from the outset.
Measure: affordable completions by tenure; months between first occupation and the first school, surgery or shop. Indicator: those two numbers, reported per broad location. Dataset: MHCLG live tables, LPA AMRs, education and ICB returns. If "from the outset" has no month or occupation trigger, the outcome cannot fail, so it cannot be monitored.
How this links to examination
PM14's effective test asks whether local plans will be capable of identifying sites to implement the spatial strategy, and it flags post-adoption monitoring where the SDS is relying on a change in market conditions. An outcomes framework is the place that monitoring lives. If the framework only restates the vision, it will not help at year seven when PM1 asks whether the SDS should be replaced early.
Questions
- Is an outcomes framework required for an SDS?
- The Act requires policies, justification, a period, climate change and nature-recovery account. PM1 requires monitoring and a replacement cycle. Neither publishes a mandatory indicator set. A framework is how you make those duties usable.
- What goes wrong if you only write a vision?
- The Oxfordshire Strategic Vision (2021) is the cautionary example: a shared cross-authority vision without attached measures at adoption. The vision can still help. It cannot tell you whether the SDS is working.
Sources
- NPPF August 2026, policy PM1 (Spatial development strategies) — MHCLG, 17 August 2026
- NPPF August 2026, policy PM2 (Local plans) — MHCLG, 17 August 2026
- The London Plan: the spatial development strategy for Greater London — Greater London Authority, 2 March 2021
- Oxfordshire Strategic Vision for Long-Term Sustainable Development — Oxfordshire authorities, 1 January 2021
- Well-being of Future Generations (Wales) Act 2015 — legislation.gov.uk, 29 April 2015
Related
- Worked example — ten outcomes for a growth-corridor SDS — Outcomes
- How to write one SDS outcome — Outcomes
- SDS outcomes framework template — Templates
- Cumulative impact assessment at strategic scale — Evidence